Big plans start
with a conversation.
Tell us about your building’s use, location and required number of units.
Prepare a project brief
Tell us about your building’s use, location and required number of units.
PDFDownload cataloguePDFDownload portfolioMeet us
in Sidoarjo.
Jl. Soenandar Priyo Sudarmo No.990, Sekelor Selatan, Watutulis, Kec. Prambon, Kabupaten Sidoarjo, Jawa Timur 61264
Map based on the catalogue address search. Exact pin requires confirmation.
Open in Google MapsSidoarjo, Jawa Timur
Google Maps requires an internet connection.
What you
want to know.
An introduction to planning your modular building requirements.
Discuss your project01What is a modular building?
+
Modular buildings use core components manufactured in a factory, then transported and assembled on site. The Modusteel catalogue describes floors, walls, roofs and openings as parts of the system.
02What can these buildings be used for?
+
The catalogue lists flat-pack containers, project offices, worker dormitories, modular camps and container shops. The portfolio also includes residential, education and resort projects.
03Does IDR 34 million include all costs?
+
IDR 34 million is the catalogue price for the 3 × 6 metre Modular House. Current pricing, tax, delivery, foundations, installation and final scope must be confirmed in a formal quotation.
04Can the building be relocated?
+
The catalogue describes a system that can be disassembled and relocated. Feasibility must still be reviewed against configuration, site access and building condition.
05How long do production and installation take?
+
The catalogue does not specify a fixed timeline. A schedule should be agreed after reviewing quantity, specifications, site readiness and logistics.
06What are the wall and floor materials?
+
The catalogue specifies 50 mm rockwool sandwich wall panels and 18 mm cement fibre floor boards with a 1 mm vinyl finish.
